Streetscape - History |
|
Streetscape Project Updates:
|
|
Streetscape Open House October 19, 2007
Events at Heritage
Square:
8:00 a.m. Contractor's Event
Refreshments provided by Grandma Tobler's Kitchen and Bakery
9:00 a,m. City Staff event
Refreshments provided by Grandma Tobler's Kitchen and Bakery
12:00 noon Ribbon Cutting &
Grand Opening for Invited Dignitaries and Public
Refreshments provided by Wayne from the Dixie Center 11:00 until 2:00
p.m.
Entertainment: Umpah Band
5:00 - 7:00 p.m. Santa
Clara Drive Resident's Neighborhood Social
Refreshments: Dutch Oven Cobbler and Ice Cream provided by Staheli
Catering
Entertainment: Umpah Band
Promotional Events
running at Local Business October 19th and October 20th
|
|
As of July 9, 2007. Concrete work, including sidewalks and
driveway approaches continue on the west end of Santa
Clara Drive. Roadway Planter installation and Landscaping continues
along Santa Clara Drive.
Posted 07/10/2007
|
|
As of June 20, 2007. Construction continues with Asphalt paving this
week and next. Concrete sidewalks continues
on
the south side of Santa Clara Drive Installation of side and
middle planters will continue for the duration of the
project. Traffic will be one lane in each direction. Some side roads off
of Santa Clara Drive will be temporary closed
during the Asphalt paving, seek alternate route, do not drive on newly
asphalted roads.
Posted 06/20/2007
|
|
As of June 14, 2007.
Read Flyer
Posted 06/14/2007
|
|
As of June 11, 2007. On the north side of Santa Clara Drive
construction work continues with manhole placement
and
lightpole installation for the next two weeks. On the south side of
Santa Clara Drive, west of Chapel street curb and
gutter installation continues with concrete flatwork following for the
next several weeks. Installation of side planters will
begin and continue for the duration of the project. Traffic will be one
lane in each direction. There are no closed roads or
detours at this time.
Posted 06/12/2007
|
|
As of May 9, 2007.
Construction continues
on Santa Clara Drive. On the south side between Old Farm Road and
Vernons
St and on the north
side between Quail St. and Gates Lane Concrete pouring will begin on
Monday May 14th and continue
through out the week
with sidewalk and driveway pouring. Please park away from this
construction area and note that
sidewalks and
driveways will be inaccessible.
Posted 05/09/2007
Read
Flyer |
|
As of April 24, 2007. Construction work will continue on Santa Clara
Drive, from Old Farm Road to Victors Street
with
underground electrical trenching. Also on the south side of Santa Clara
Drive there will be surface improvements
including concrete curb, gutter, sidewalks and driveways. From Chapel
Street to Quail Street on the north side there
will be
installation of an irrigation line.
Posted 04/24/2007
|
|
As of April 13, 2007.
Construction work continues with electrical trenching on the south side
of Santa Clara Drive
from
the city offices to Old Farm Road and Landscape trenching from Old Farm
Road to Chapel Street. Roadway
Excavation and Curb & Gutter installation continues from approximately
2603 Santa Clara Drive to the city offices.
Posted 04/16/2007
|
|
As of April 9, 2007.
Construction continues on Santa Clara Drive with underground electric
trench work on the south
side
from the city offices to the west. Road base installation and surface
improvements including concrete work
continues on the north side from Chapel St. to Quail and on the south
side from Heights to the city offices.
Posted 04/10/2007
Read
Flyer |
|
As of April 3, 2007.
Roadwork continues on the north side of road from Old Farm Rd. to
the west end of the
project. Installation of the utility trench continues from
City Offices to Old Farm Rd. Water services connections
to homes begin at Chapel St. to west end of project. |
|
As of March 20, 2007.
Construction on Santa Clara Drive includes installing the water line,
Road Grading
Reconstruction and Concrete Pouring. The water services continue
on the north side of Santa Clara Drive from
Chapel to Gates. Pouring Concrete Curb, Sidewalk and Driveways will
continue this week on Santa Clara Drive,
from Santa
Clara View to Chapel, watch for flyers. Newly poured concrete will be
inaccessible for at least 4 days.
Please park all vehicles away from this construction area.
Electrical work continues on the south side of Santa
Clara from Heights to
Santa Clara View Drive.
Posted 03/20/2007
|
|
URGENT RELEASE!! As of March
8, 2007.
Construction on Santa Clara Drive includes installing the water
line, road grading reconstruction and concrete pouring. Due
to an unexpected issue during the road excavation on
Santa
Clara Drive there will be a temporary road closure from March 9th
through March 11 between Hamblin
Drive
& Quail St. Santa Clara Drive will be open to local and
business traffic only. Residents west of Quail will
have
access from Pioneer Parkway and Highway 91. Through traffic
detour will be at Lava Flow Drive off of
Sunset and Pioneer Parkway off of Highway 91. The water
services continue on the north side of Santa Clara
Drive
from Chapel to Gates. Pouring concrete curb, sidewalk and
driveways will begin this week from Santa
Clara
View Drive to Chapel. Newly poured concrete will be
inaccessible for at least 4 days. Please park all
vehicles away from this construction area.
Posted 03/9/2007
Read
Flyer
|
|
As of March 7, 2007.
Construction on Santa Clara Drive includes installing the water
line, road grading reconst-
ruction and concrete pouring. The water services continue on
the north side of Santa Clara Drive from Chapel to
Gates. Pouring concrete curb, sidewalk and driveways will
begin this week from Santa Clara View to Chapel.
Newly
poured concrete will be inaccessible for at least 4 days.
Please park all vehicles away from this construc-
tion
area.
Posted 03/7/2007
Read
Flyer |
|
As of February 26, 2007.
Construction Continues on Santa Clara
Drive installing Water, Sewer and Road Grading
Reconstruction. The water services are on the north side of the road
from Chapel to Gates. The sewer work is on the
south side from Chapel to just past Old Farm Road. Road reconstruction
continues on the west end of Santa Clara
Drive.
Posted 02/26/2007
|
|
As of February 20, 2007.
On Santa Clara Drive work continues on the
subgrade and electrical conduit installation
beginning from the east and going to Old Farm Road, on the south side of
the street. Subgrade and preparation for
curb and gutter continues on the north side of the street
from Old Farm Road to Chapel.
Posted 02/21/2007
|
|
As of February 7, 2007.
On Old Farm Road, Road grading and reconstruction finishes and
paving begins.
Also on Heights and Vineyard paving begins, Road access will be
restricted during the working hours of 7:30
am - 5:00 pm. Please keep all vehicles off the street
during these hours and plan to park away from these areas.
Paving is scheduled for Feb. 12th through Feb. 15th. Paving
also begins on the North east end of Santa Clara Drive.
Please keep all vehicles off the street and parked in an
accessible place.
There will be a temporary traffic
adjustment
on Santa Clara drive. West
Bound traffic will be moved to the north side shoulder for a given
stretch.
Posted 02/07/2007 Amended 2/8/2007
Read Flyer
|
|
As of February 1, 2007.
Construction continues on Santa Clara Drive and Old Farm Road.
Sidewalk and
Flatwork prep continues on Old Farm Road and concrete pouring will
continue through out the week. Road
grading and reconstruction begin and continues through next week.
Sidewalk, curb and gutter removal will
continue on Santa Clara Drive and paving will begin the middle of
next week. There will be a temporary traffic
adjustment on Santa Clara Drive. West bound traffic will be
moved to the north side shoulder for a given stretch. |
|
As of November 27, 2006.
Work continues on Santa Clara Drive with the storm drain and water line.
Traffic
will continue to be one lane in certain areas, watch for
flaggers. Work continues on the Storm drain finishes up on
Old Farm Road. Curb and Gutter prep continues on
Heights Drive, Vineyard Drive and Santa Clara Parkway.
Posted 11/28/2006 |
|
Project Open Houses
Currently scheduled for January 10th, February 14th and March 14th 2007
at 6 p.m. City
Offices, 2721 Santa Clara Drive
Posted 11/28/2006
|
|
As of November 3, 2006.
On Vineyard and Heights Dr. the installation of the water line
continues. There will
be a temporary water shut off on Monday the 6th and Tuesday the 7th
from 8 am - 5 pm. The water line install-
ation continues on Santa Clara Dr. west of Heights Dr. A
temporary water line will be placed above ground on
Santa Clara Dr. along the work area through mid November.
Traffic will continue to be one lane in certain areas,
watch for flaggers. Work on Old Farm Rd. continues, with the
installation of the storm drain for another week,
local traffic will have access. Electrical work off the side
of the road continues, this week on Santa Clara Dr.
Sewer work on Santa Clara View Dr. will begin causing that road to
be temporally closed as of Monday the
6th through Wednesday the 8th at the intersection of Santa Clara Dr. |
|
|
|
As of October 26, 2006.
Sub Grad for curb and gutter on Vineyard, Heights Drive and
Riverwood Lane will
begin
around the 29th. The water line installation begins on Santa
Clara Dr. between Santa Clara Parkway and
Heights Dr. A temporary water line will be placed above ground
on Santa Clara Dr. along the work area through
mid
November. On or around the 30th, Heights Dr. will be closed to
install the water line. Installation of the
storm
drain behind homes off of Santa Clara Dr. will be completed this
week. Work on Old Farm Rd. continues,
with
the installation of the storm drain for an estimated three weeks,
only local traffic will be permitted. Electrical
work
off the side of the road continues, this week near Santa Clara
Parkway. |
|
As of October 18, 2006.
Construction continues on Vineyard, Heights Drive and Riverwood Lane
installing the
Sub Grad for curb and gutter. The water line installation
begins on Santa Clara Drive between Santa Clara Parkway
and Height Drive. A temporary water line will be
place above ground on Santa Clara drive along the work area
through mid November. On or around the 26th,
Heights Drive will be closed to install the water line.
Installation
of the Storm Drain continues behind homes off of Santa Clara Drive.
Work on Old Farm Road continues, with the
installation of the Storm Drain beginning early next week, only local traffic
will be permitted. Electrical work off the
side of the road continues near Swiss Village and Gates
Lane. Flyers will be posted on doors on Old Farm Road
for additional information
Posted
10/18/2006
Read
Flyer |
|
As of October 4, 2006.
Work continues on Vineyard between Heights Dr. and Riverwood Lane
installing the
storm drain which will finish around Oct. 6th. Heights Dr.
will be closed as of Oct. 4th through Oct. 13th to install
the storm drain. Work on Santa Clara Dr. continues from
Heights Dr. headed east on the north side of the street
for several blocks. Removal of sidewalks and curbs will
continue with construction. Flyers will be posted on doors
to some homes for additional information.
Posted
10/4/2006
Read
Flyer
|
|
As of September 26, 2006.
There are no new updates on the Streetscape Project.
Please see the previous weeks updates for the latest news
and information. Posted
9/26/2006
|
|
Santa Clara City Streetscape
Construction: Temporary Sign Guidelines for Businesses
Posted
9/21/2006
Read
Sign Guidelines |
|
As of September 8, 2006. Work continues on Riverwood
Lane, Vineyard and Heights Dr. installing the
storm drain through mid week and and begins again on Santa
Clara Dr. from Heights Dr. headed west on the
north side of the street for several blocks. Removal
of sidewalks and curbs will continue with construction.
Flyers will be posted on doors to some homes for additional
information. Posted
9/13/2006
Read Full Announcement |
|
As of September 8, 2006. Work continues on Riverwood
Lane, Vineyard and Heights Dr. installing the
storm drain. Removal work begins along Santa Clara
Dr. from Heights Dr. headed west on the north side for
several blocks preparing the first section of streetscape improvements. During construction
the sidewalks will
be removed in the working sections, driveways will have open access. Posted
9/13/2006 |
|
Streetscape Project
Communication Plan
For Updates and Project Related Concerns Posted
9/7/2006
Read Full Announcement |
|
Construction is scheduled to
begin September 5, 2006
Work will be along Santa Clara Dr. form Heights
Dr. to the Jacob Hamblin Home for temporary road widening
& on Riverwood Lane, Vineyard & Heights Dr. for work on the storm
drain for an estimated three weeks. Posted
9/1/2006
Read Full Announcement |
|
Groundbreaking Event
Santa
Clara City Streetscape Groundbreaking Event, September 6, 2006, at
5:00 p.m. 2587 Santa Clara Drive
(staged near the
Sarah Leavitt Pioneer Monument)
Posted
9/1/2006
Read Full Announcement
|
Project Open Houses
Currently schedule
for September 27, October 11 & 25 at 6:00 p.m. City Offices, 2721
Santa Clara Drive
Posted 9/1/2006 |
|
Questions & Answers
Q:
Will I have the same access to my driveway?
A:
Yes. Your driveway access will remain the same; however, the
width of the access will be determined by the width of your needed
driveway.
Q:
Will there be parking on the street in front of my residence?
A:
Yes. There will be parallel parking on the street, but it will
not be continuous. There will be sections where plantings
exist and then a group of parking spaces and then more plantings and
so on.
Q:
Will there be a drainage system that keeps runoff away from my
property?
A:
Yes. There will be a new underground drainage system, and the
engineering design of the street will direct any runoff flow into
the City's storm drain system.
Q:
Will there be sidewalks in front of my home?
A:
Yes. There will be sidewalks the entire length of the
streetscape on both sides of the street. One side of the
street will have at least a five-foot-wide sidewalk surface, while
the opposite side of the street will have a wider walkway to
accommodate bike space for youth and others.
Q:
Will there be a bike path in front of my home?
A: Not
in the traditional sense. We are assuming that children and
slow bikers will be content with the sidewalks, which will be wide
enough to accommodate this mixed use. However, we are
considering striping on the roadway for other bike traffic.
Q: If
there are new plantings along the street, who will be responsible
for their upkeep?
A: Any
plantings put in by the City for the new streetscape design will be
maintained by the City unless other arrangements are made with the
homeowner.
Q: Who
will pick up the leaves in the streetscape?
A: The
City will take care of leaves within the streetscape plantings, the
gutters/waterways, and the street.
Q:
Will it be difficult to cross the new street?
A: No.
Today the street is very wide and many motorists pass illegally on
the right, going into the dirt. The new streetscape will
prevent that and make it much easier and safer to cross the street.
There will also be specific pedestrian crosswalks at intersections.
Q:
Will there be lighting on the street?
A:
Yes. The streetscape design calls for decorative streetlights
along the street and sidewalk. There may be other lighting as
well at specific points of interest.
Q:
Will the speed limit be the same?
A:
Yes. The speed limit will remain the same, but the streetscape
purposely has been designed to calm or slow the traffic.
Q:
Will my view be block by additional plantings?
A: No.
Any streetscape plantings will be placed for optimum beauty and
safety, taking into account the view from a home as well as into a
home and yard.
Q: How
will this benefit the City?
A: 1)
Drainage. The City has struggled with drainage on Santa Clara
Drive for many years. The new streetscape design will solve
this problem.
2) Walk able streets. There has been a push to add sidewalks
and widen existing ones. Santa Clara residents need a safe and
pleasant way to walk to their neighbor's, the post office, and to
the new business that are beginning to come to the downtown.
Santa Clara is a beautiful city and will be even more attractive as
a safe, walk able community. |
|
Timeline, Questions and
Answers.
Posted 12/27/2006
Read
Flyer Before and After Photo
Simulations

Existing Santa Clara Drive Proposed Santa Clara Drive

Existing Santa Clara Drive Proposed Santa Clara Drive

Existing Santa Clara Drive Proposed Santa Clara Drive
|
|
|
 |
|
|
Local Advertising Coming Soon.. |
|
|
 |
The City of Santa Clara, UT
2721 Santa Clara Drive
Phone: (435) 673-6712 |